Lenze PLC Designer PLC Designer (R2-x) Manuel d'utilisateur Page 146

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 844
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 145
L-force | PLC Designer
The Individual Components
144 DMS 3.2 EN 02/2011 TD29
6.3.10 'File' 'Exit'
Shortcut: <Alt>+<F4>
With this command you exit from PLC Designer.
If a project is opened, then it is closed as described in 'File' 'Save'.
6.3.11 'Project' 'Build'
Shortcut: <F11>
The project is compiled using 'Project' 'Build'. The compilation process is basically
incremental, that is only changed POUs are recompiled. The necessary information
about the last compilation is stored in a *.ci-file when the project is saved. A non-
incremental compilation can also be obtained if the command 'Project' 'Clear all' is
first executed.
For target systems that support Online Change, all POUs that will be loaded into the
controller on the next download are marked with a blue arrow in the Object Organizer
after compilation.
The compilation process that is carried out with 'Project' 'Build' occurs automatically if
the controller is logged-in via 'Online' 'Log-in'.
During compilation a message window is opened which shows the progress of the
compilation process, any errors and warnings which may occur during compilation as
well as information on the used POU indices and memory space (number and
percentage). Errors and warnings are marked with numbers. Using F1 you get more
information about the currently selected error.
Vue de la page 145
1 2 ... 141 142 143 144 145 146 147 148 149 150 151 ... 843 844

Commentaires sur ces manuels

Pas de commentaire