
1.3 EN - 07/2012 L 211
PLC Designer V2.x| Lenze Application Samples
Working with the sample projects
9300 - "LAS_40_INTF_Can_93_EP" sample project
The CAN monitorings are activated in the project: monitoring time of 3000 ms, "error"
response in the controller.
[8-50] Parameterisation of the 9300 in the »Global Drive Control«: Example of setting a "Trip" in the controller
Commentaires sur ces manuels