PLC Designer V2.x| Lenze Application Samples
Working with the sample projects
9400 HighLine - "LAS_40_INTF_Can_94HL_TabPos" sample project
4. Update the project by clicking :
Select the option Rebuild all
Click the Build button to update the project.
5. Going online
After a connection to the controller has been established successfully, the following
status is displayed in the Status line:
6. Download parameter set
This command causes parameter settings in the controller to be overwritten by
parameter settings of the »Engineer« project.