Commissioning
Before switching on
7
241
EDS84ASC552 EN 9.1
7 Commissioning
Note!
ƒ Please observe the general safety instructions ( 12).
ƒ Please observe the notes regarding residual hazards ( 18).
7.1 Before switching on
Note!
ƒ Comply with the respective switch-on s equence.
ƒ In case of trouble during commissioning, the following supports you:
– The ”Diagnostics” chapter
– The online help in the »Engineer«
– The software manual of the prevailing device version
In order to avoid injury to persons or damage to material assets, check ...
... before switching on the mains voltage:
ƒ Check the wiring for completeness, short-circuit and earth fault
ƒ The ”emergency switching off” function of the entire plant
ƒ The motor circuit configuration (star/delta) must be adapted to the output voltage
of the controller
ƒ The in-phase connection of the motor
ƒ The direction of rotation of the incremental encoder (if available)
...the setting of the most important drive parameters before controller enable to ensure
the following:
ƒ The V/f rated frequency is adapted to the motor circuit configuration!
ƒ Th e drive parameters relevant for your application are set correctly!
ƒ The configuration of the analog and digital inputs and outputs are adapted to the
wiring!