Lenze L-force I/O System 1000 Manuel d'utilisateur Page 20

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 99
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 19
L-force Controls | I/O System 1000
Configuring the station structure
Creating a new project (select component from catalogue)
20 L 2.0 EN - 11/2010
7. Enter the filing location for the project directory in the Directory input field.
If the indicated directory is not available, it will be recreated.
You can optionally select an available directory via the Browse... button.
If you select the Always save projects here option, the indicated directory will
be the standard memory location for new projects.
8. Press Complete.
•The Insert a component dialog box appears.
Step 4 - Component
9. Select the I/O system tab.
•The Search results list field displays all I/O systems available.
10. Select the "I/O system 1000: CAN" module from the Search results list field.
More details and technical data of the selected module are displays on the right
side.
11. Press Next.
Vue de la page 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 98 99

Commentaires sur ces manuels

Pas de commentaire