Lenze L-force I/O System 1000 Manuel d'utilisateur Page 19

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 99
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 18
2.0 EN - 11/2010 L 19
L-force Controls | I/O System 1000
Configuring the station structure
Creating a new project (select component from catalogue)
Step 2 - Properties
4. Enter the corresponding properties of the projects into the input fields (name,
order number, etc.).
You can always change the properties subsequently.
Later you will find the name as project name in the Project view.
5. Press Next.
Step 3 - Storage location
6. The Name entered before is suggested as project name. If required, change the
suggestion accordingly.
The project name is also the name for the project directory to be created.
Vue de la page 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 98 99

Commentaires sur ces manuels

Pas de commentaire