Lenze · PLC Designer | Migration of V2.x projects · 1.2 EN - 02/2013 19
Update of a project from V2.x to V3.x
Import of the example project into the »PLC Designer« V3.x
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7.2 Import of the example project into the »PLC Designer« V3.x
How to import a V2 project into the »PLC Designer« V3.x:
1. Start»PLC Designer« V3.x.
2. Open the »PLC Designer« V2 project (FileOpen project):
Select file extension *.pro (CoDeSys projects (before V3.0).
3. Convert devices
Replace the target system set in the V2 project by a corresponding V3 target system.
Note: You have the option to save the assignment for future projects: Activate the control
field to replace the target system automatically by this V2 target system during the next
project import.