Lenze g700 Planetary gearboxes with servo Manuel d'utilisateur Page 11

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 10
Commissioning and operation
Important notes
5
EN
11
Lenze ¯ MA 12.0015 ¯ 1.0
5 Commissioning and operation
5.1 Important notes
Stop!
The drive may only be commissioned by skilled personnel!
¯ Take safety measures prior to any operation:
Disconnect the machine from the mains, ensure standstill of the drive system
and avoid any machine movement.
5.2 Before switching on
Please check:
¯ Drive function - machine function assignment
¯ The direction of rotation of the drive shaft
g700 with servo motor
¯ Does the drive appear undamaged?
¯ Is the mechanical fixing o.k.?
¯ Is the electrical connection correct?
¯ Are all rotating parts and surfaces that may become hot protected against
contact?
5.3 During operation
During operation, check the drive periodically and take special care of:
¯ changes compared to normal operation, like
unusual noise, stronger vibrations or increased temperatures,
leakages,
loose fixing elements,
the condition of the electrical cables.
¯ In case of faults:
shut down the drive,
check the troubleshooting table.
If the fault cannot be remedied, please contact the Lenze customer service.
Vue de la page 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16

Commentaires sur ces manuels

Pas de commentaire